Apply Online for New Domestic Gas Connection: SNGPL / RLNG Meter Registration 2025

Apply Online for New Domestic Gas Connection

New domestic gas connections in Pakistan have been incapacitated for some years, but in 2025 the government resumed issuance of RLNG-based domestic gas connections (i.e. piped gas full through regasified liquefied natural gas). Sui Northern Air Tubes Limited (SNGPL) has complete it obligatory that all novel applications must be submitted online via its official portal. This updated process replaces older natural gas connection requests and safeguards slide, faster dispensation, and a clearer path from application to meter connection.

Quick Information Table for Apply Online for New Domestic Gas Connection

FieldDetail
Program NameNew Domestic RLNG / LNG Gas Connection (SNGPL)
Start of New PolicySeptember 2025 (ban lifted)
Application MethodOnline only via SNGPL website / portal
Priority / CategoriesApplicants with old demand notice, urgent requests, fresh applications
Costs / ChargesSecurity refundable Rs. 20,000; service line Rs. 1,500 (≤10 marla), Rs. 3,000 (>10 marla)
Urgent Application FeeRs. 25,000 additional for fast processing

Why the Change & What’s New in 2025

Background — Ban & Resumption

  • Pakistan had a ban on new gas connections since about 2021 due to depletion of gas reserves.
  • In September 2025, the government officially lifted the ban and allowed new connections—but only under RLNG tariff / supply.
  • SNGPL announces that new connections will now be RLNG-based only; traditional indigenous gas connection requests are no longer accepted.

What’s New in Policy & Procedure

  • Only online applications are accepted; no physical submission at offices.
  • Applicants who had paid demand notices earlier (before the ban) will get priority if they pay the differential security and agree to RLNG contract.
  • Urgent application category is introduced, with a fixed urgent fee for faster processing.
  • Fees and security deposits have been revised to match RLNG infrastructure and tariff needs.

These changes aim to modernize, speed up, and make transparent the new domestic gas connection process.

How to Apply Online for a New Domestic Gas Connection (RLNG)

Here’s step-by-step Apply Online for New Domestic Gas Connection guidance to help you apply correctly:

Steps to Apply

  1. Go to SNGPL’s Online Application Portal
    Use the official SNGPL link: sngpl.com.pk/onlineapp/pages/form.jsp
  2. Select “Domestic RLNG Connection” / “New Connection”
    The form supports “RLNG Normal” or “RLNG Fast Track” options.
  3. Fill in Personal, Property & Contact Info
  • Name, father/husband name (S/O, D/O, W/O)
  • CNIC number and issue date
  • Address of the premises (detailed lines, landmark)
  • Mobile number (active), telephone, email
  1. Upload Required Documents
  • CNIC (front & back) scans or photos
  • Proof of property ownership (deed, registry, allotment, lease + NOC if tenant)
  • Neighboring gas bill (if property is within network) to validate pipeline presence
  • Photos of premises (sometimes optional but helpful)
  1. Submit the Application
  • After filling all mandatory fields, submit and receive a reference number you can use to track status.
  • The system rejects incomplete or invalid applications.
  1. Site Survey & Verification
  • SNGPL will assign a surveyor to inspect whether your premises falls within their gas distribution network.
  • If pipeline is absent, the application may be cancelled or the property declared non-feasible.
  1. Issuance of Demand Notice / Contract
  • On approval, a demand notice is issued (security, service line charges).
  • The applicant signs the RLNG supply contract.
  1. Payment & Installation
  • Deposit security, service line cost, any differential payments.
  • SNGPL installs the RLNG meter, connects your home to pipeline, activates flow.
  • Meter reading recorded and billing begins under RLNG tariff.

Use the SNGPL Mobile App / ConnectOn

You can also use “SNGPL Apply Online for New Domestic Gas Connection mobile application to apply, track status, view bills, etc.

Documents Required

Here is the full list of mandatory and optional documents:

Mandatory Documents

  • Valid CNIC (front & back)
  • Property ownership proof (sale deed, registry, allotment, lease + NOC)
  • Neighboring gas consumer’s bill (if available)
  • Precise address + landmark
  • Survey may require photos of the premises

If any document is missing or incorrect, your application may be rejected at any stage.

Priority & Categories (Who Gets First Connect)

SNGPL Apply Online for New Domestic Gas Connection the government has defined priority categories for allocating new RLNG connections:

  • Applicants who had already paid demand notice / urgent fee before the ban: they get priority after paying differential and signing RLNG contract.
  • Applicants with earlier (old) applications get next priority.
  • New / fresh applicants are allocated after above groups under a merit list.
  • Urgent / fast-track applications pay extra fee (Rs. 25,000) for faster processing.

Note: The term “merit” means applications are treated in order with importance groups, not chastely first-come first-served.

Costs, Charges & Fee Structure

What You Must Pay

  1. Refundable Security Deposit: Rs. 20,000 (refundable)
  2. Service Line / Infrastructure Charges:
  • Up to 10 marla: Rs. 1,500
  • Above 10 marla: Rs. 3,000
  1. Urgent / Fast Track Fee: Rs. 25,000 extra (if you want faster processing)
  2. Demand Notice / Differential Charges: If previously demand notice paid under old scheme, you must pay differences.
  3. No application submission fee (i.e. applying online itself is free)

Tariff / Billing

  • Once connected, billing will be on RLNG tariff, which is higher than old scheme gas tariff.
  • OGRA (regulator) controls the RLNG gas price per unit, counting taxes, monthly.
  • New consumers may see per unit cost ~ Rs. 4,000 per mmBtu (counting sales tax) in certain statements.

Common Issues / Delays & Solutions

Typical Problems & How to Fix

ProblemLikely CauseSuggested Fix
Application rejected immediatelyIncomplete or invalid info/documentsDouble-check every field, upload clear documents
Property not falling on networkPremises not close to gas pipelineConfirm pipeline existence beforehand, or ask for network extension
Delay in survey / installationHigh backlog or uneven allocationUse “urgent” option if needed, check status online
Confusion with old applicationOld natural gas applications are now invalidApply afresh under RLNG portal, use priority channels if you had prior notice
Discrepancy in address / nameMismatch with CNIC or property papersMake sure all names and addresses match your documents

If you face any issue, contact SNGPL’s customer care (1199) or through their app ConnectOn.

Benefits & Why RLNG Connections Matter

Why It’s Good for You & the Environment

  • Access to piped gas is cheaper than LPG cylinders in many cases.
  • Transparent billing under regulated RLNG tariff.
  • Online tracking and digital processing reduce corruption and delays.
  • Cleaner energy and infrastructure for growth.
  • Previously blocked new connections now available — increasing equality.

FAQs (Apply Online for New Domestic Gas Connection)

Can I still apply under old natural gas system?

No. All new influences must now be RLNG-based. Old requests under natural gas are unacceptable.

How long does it take for gas connection?

Depends on category (normal vs urgent) and survey backlog. It may take a few weeks or more.

Do I need to visit SNGPL office?

For most users, no. Entire process is online from application through tracking.

If I had an old demand notice, do I need to apply anew?

You can use a special portal / priority process. You’ll need to pay changes and sign RLNG contract.

Is RLNG tariff expensive?

Yes, it’s higher than system gas tariffs, but still generally cheaper than LPG cylinders.

Conclusion: How to Ensure Your Application Succeeds

  • Apply via SNGPL’s official RLNG online portal — that’s the only accepted method.
  • Ensure your property lies within SNGPL’s existing network before applying.
  • Use correct, clear, and matching documents and names.
  • Choose “urgent / fast track” if you want priority (pay extra).
  • Track your application status using the reference number.
  • Install meter only after formal approval and contractor visit.

With the 2025 Apply Online for New Domestic Gas Connection reforms, applying for a domestic gas connection is now more see-through and modern. If you follow this full guide carefully — from confirming stuff to uploading correct leaflets — your trail to a new RLNG gas joining should be even and effectual.